Contract Quality Guarantee Procedure

Languages: 中文 | English | Español | 日本語 | 한국어 | Tiếng Việt | ไทย | Русский

📖 Detailed Explanation

The Contract Quality Guarantee Procedure refers to the specific operational processes and rules regarding quality assurance in foreign trade contracts. It is usually an appendix to the contract or a separate clause that details how the seller ensures the goods meet the agreed quality standards, and how the buyer can raise quality objections and claims. Usage scenarios include: bulk commodities, machinery and equipment, electronic products, and other transactions with high quality requirements. Precautions: 1) The quality guarantee period, inspection standards (e.g., ISO, GB), inspection agencies (e.g., SGS, BV), and inspection location should be clearly specified; 2) It should be distinguished from the 'Quality Guarantee Clause,' which is a principled provision, whereas the procedure focuses more on operational steps; 3) It differs from the 'Inspection Clause,' which focuses on the right and timing of inspection, while the procedure covers the entire process from production to after-sales; 4) The handling of non-conforming products (return, replacement, price reduction) and cost bearing must be agreed upon; 5) Attention should be paid to the linkage with force majeure and claim periods. This term helps reduce quality disputes and clarify the responsibilities of both parties.

📝 Examples

1. According to the Contract Quality Guarantee Procedure, the seller shall entrust SGS to conduct sampling inspection before shipment and issue a qualification report; if the buyer discovers quality non-conformity within 30 days after receipt, they may file a claim based on the commodity inspection certificate. (Note: specifies inspection agency, time, and basis for claims) 2. The Contract Quality Guarantee Procedure stipulates that after installation and commissioning of the equipment, a 72-hour trial run is required, and only when all indicators meet the requirements of the technical annex shall it be deemed qualified; otherwise, the seller must replace parts free of charge. (Note: for equipment transactions, specifies trial run as a key step in quality assurance)

💡 Foreign Trade Tips

📧 Use Business Email Helper